Lurie Children's Hospital
At Ann & Robert H. Lurie Children’s Hospital of Chicago, boiler plant reliability is mission critical. The existing system utilized legacy Cleaver-Brooks Hawk controls, which limited flexibility and required support…
AOS
BEC partnered with an installing contractor to replace a Gordon Piatt burner based on obsolescence and old-style, inefficient linkage controls. The estimated savings were calculated at 5.83% annually, however upon…
Thornwood High School
BEC replaced two 500hp burners on low pressure steam heating boilers at a south suburban high school. With Webster burners engineering help, we designed a new burner model to retrofit these old coal fired boilers.
Chicagoland Hospital
BEC replaced two (2) Industrial Combustion D burners based on poor performance with low-load demands. Though data analysis, Weishaupt burners were chosen for replacement due to their high performance, high turndown…
Trifecta Container
BEC fabricated a “boiler room in a box” with the help of some local contractors. The customer provided a used boiler to which BEC refurbished and retrofitted with a <30ppm, Dual Fuel Burner. BEC provided the water…
Olin
BEC replaced a 200hp burner and a 300hp burner with retrofits.
The new burners output more than the previous burners. This critical production facility used to run 3 boilers to keep up with…