Boiler Equipment Company

PROJECT PORTFOLIO

AOS –
Asphalt Operating Services

BEC partnered with an installing contractor to replace a Gordon Piatt burner based on obsolescence and old-style, inefficient linkage controls.  The estimated savings were calculated at 5.83% annually, however upon post verification the actual savings were closer to 8.5%.

The customer now has higher confidence in his boiler operation.  The new burner outputs more than the previous burner as its setup for actual nameplate of the boiler. They are now getting a greater output from the boiler/burner and using less gas.

More Projects

Chicagoland Hospital

BEC replaced two (2) Industrial Combustion D burners based on poor performance with low-load demands.  Though data analysis, Weishaupt burners were chosen for replacement due to their high performance, high turndown…

Lincoln Park Zoo

BEC engineers packages to fit.  Due to the age of the boiler room at Lincoln Park Zoo, replacing the existing deaerator posed some complicated challenges.  The existing deaerator was located on a mezzanine…

Thornwood High School

BEC replaced two 500hp burners on low pressure steam heating boilers at a south suburban high school.  With Webster burners engineering help, we designed a new burner model to retrofit these old coal fired boilers.