Boiler Equipment Company
PROJECT PORTFOLIO
Olin
BEC replaced a 200hp burner and a 300hp burner with retrofits.
The new burners output more than the previous burners. This critical production facility used to run 3 boilers to keep up with operational high loads and now only need two as the actual output and efficiency has been dramatically increased from the new retrofits. The customer is looking to replace the burner on the third boiler with the savings from the first two retrofits.
More Projects
AOS
BEC partnered with an installing contractor to replace a Gordon Piatt burner based on obsolescence and old-style, inefficient linkage controls. The estimated savings were calculated at 5.83% annually, however upon…
Lincoln Park Zoo
BEC engineers packages to fit. Due to the age of the boiler room at Lincoln Park Zoo, replacing the existing deaerator posed some complicated challenges. The existing deaerator was located on a mezzanine…