Boiler Equipment Company
PROJECT PORTFOLIO
Chicagoland Hospital
BEC replaced two (2) Industrial Combustion D burners based on poor performance with low-load demands. Though data analysis, Weishaupt burners were chosen for replacement due to their high performance, high turndown, low excess O2, and high efficiency. BEC estimated that the initial gas savings to the customer to be 8.16% annually. Nicor gas post verified the gas usage using real time monitors and found it to be a 12.76% actual savings.
The customer stated that the boilers have never run better and can now handle their low load demands with ease. The energy savings exceeded expectations, and the boiler room is much quieter. They can now focus their time on other areas with less worrying about their boiler room operations.
More Projects
AOS
BEC partnered with an installing contractor to replace a Gordon Piatt burner based on obsolescence and old-style, inefficient linkage controls. The estimated savings were calculated at 5.83% annually, however upon…
Lincoln Park Zoo
BEC engineers packages to fit. Due to the age of the boiler room at Lincoln Park Zoo, replacing the existing deaerator posed some complicated challenges. The existing deaerator was located on a mezzanine…