Project Portfolio
Whether you’re building new or updating, Boiler Equipment Company is ready to assist. Our project case studies offer a glimpse into our work and how we help customers find the right solutions for their needs.
Level 1 Trauma Center
When a hospital and Level 1 Trauma Center outside of Chicago needed to replace its dated, inefficient steam-to-domestic hot water heat exchanger system that offered no building connectivity, it turned to BEC for a solution.
Foods Processing Plant
A large foods processing plant and co-packing company with FDA, organic, BRCGS, and halal certifications in Southern California was experiencing frequent boiler downtime, causing productivity issues and higher fuel costs.
AOS
BEC partnered with an installing contractor to replace a Gordon Piatt burner based on obsolescence and old-style, inefficient linkage controls. The estimated savings were calculated at 5.83% annually, however upon...
Lincoln Park Zoo
BEC engineers packages to fit. Due to the age of the boiler room at Lincoln Park Zoo, replacing the existing deaerator posed some complicated challenges. The existing deaerator was located on a mezzanine...
Chicagoland Hospital
BEC replaced two (2) Industrial Combustion D burners based on poor performance with low-load demands. Though data analysis, Weishaupt burners were chosen for replacement due to their high performance, high turndown…
Northwestern Flavors
BEC partnered with an installing contactor to replace one obsolete (1) 1984 North American burner with inefficient linkage controls. The customer now has higher confidence in his boiler operation.