Boiler Equipment Company

PROJECT PORTFOLIO

Projects

AOS

BEC partnered with an installing contractor to replace a Gordon Piatt burner based on obsolescence and old-style, inefficient linkage controls.  The estimated savings were calculated at 5.83% annually, however upon…

Lincoln Park Zoo

BEC engineers packages to fit.  Due to the age of the boiler room at Lincoln Park Zoo, replacing the existing deaerator posed some complicated challenges.  The existing deaerator was located on a mezzanine…

Thornwood High School

BEC replaced two 500hp burners on low pressure steam heating boilers at a south suburban high school.  With Webster burners engineering help, we designed a new burner model to retrofit these old coal fired boilers.

Chicagoland Hospital

BEC replaced two (2) Industrial Combustion D burners based on poor performance with low-load demands.  Though data analysis, Weishaupt burners were chosen for replacement due to their high performance, high turndown…

Northwestern Flavors

BEC partnered with an installing contactor to replace one obsolete (1) 1984 North American burner with inefficient linkage controls. The customer now has higher confidence in his boiler operation.

Olin

BEC replaced a 200hp burner and a 300hp burner with retrofits.

The new burners output more than the previous burners. This critical production facility used to run 3 boilers to keep up with…

Trifecta Container

BEC fabricated a “boiler room in a box” with the help of some local contractors.  The customer provided a used boiler to which BEC refurbished and retrofitted with a  <30ppm, Dual Fuel Burner.  BEC provided the water…